Announcement: Reconstruction of Valve Shaft Outside the Direct-flow Pump House

  • Submission Deadline: 20/03/2026
  • Tender Status: Closed

Reconstruction of Valve Shaft Outside the Direct-flow Pump House Procurement Announcement

PT. TJK POWER, as the project legal entity responsible for the operation of Batam TJK Power Plant in Indonesia, announces that the project is now ready for procurement. We are currently implementing the procurement of the reconstruction of the valve shaft outside the direct-flow pump house and welcome potential suppliers who meet the qualification requirements to bid.

I. Purchaser (Project Legal Entity)

PT. TJK POWER

II. Funding Source

Self-funding by the Purchaser.

III. Procurement Content

NO Content Scope
TJK-2026-03-03 Reconstruction of Valve Shaft Outside the Direct-flow Pump House Demolition of old steel pipes and concrete walls, foundation cleaning, cement bedding (100mm thick), concrete walls (K300), and cable trench treatment.

IV. Project Overview

The Batam TJK Power Plant is located in Batam City, Riau Islands Province, There is a valve shaft in front of the circulating pump room. Part of the original wall was supported by steel pipes, but after years of rainwater immersion, it has completely corroded and rusted. If not repaired, it will affect the normal operation of the equipment.

V. Supplier Qualification Review Method

Please refer to the procurement documents for detailed qualification requirements.

VI. Special Notes

None.

VII. Media for Announcement and Access to Documents

  • Announcement Period: March 11, 2026 to 24:00, March 20, 2026.
  • How to get documents: Download directly from the corresponding project at https://tjkpower.com/.

VIII. Submission of Response Documents

  • Response Deadline: 24:00, March 20, 2026.
  • Submission Method: Upload via the Purchase Module on https://tjkpower.com/.
  • Note: Response documents not sent within the time limit will not be accepted.

IX. Opening of Response Files

  • Mode: Electronic opening.
  • Time: Within 3 business days after the response deadline.
  • Location: PT. TJK POWER site.

Contact Information

Contact Person: Ouyang Hua
HP: (+62) 811 – 775 1117
E-mail: ouyh@chec.com.cn