Replacement of main steam flow meters, replacement of selected pipelines and valves, welding work, and wind leakage remediation of the low-temperature section procurement announcement
PT. TJK POWER, as the project legal entity responsible for the operation of Batam TJK Power Plant in Indonesia, announces that the project is now ready for procurement. We are currently implementing the procurement of Replacement of main steam flow meters, replacement of selected pipelines and valves, welding work, and wind leakage remediation of the low-temperature section.
I. Purchaser (Project Legal Entity)
PT. TJK POWER
II. Funding Source
Self-funding by the Purchaser.
III. Procurement Content
| NO | Content | Scope |
|---|---|---|
| TJK-2026-08-06 | Replacement of main steam flow meters, replacement of selected pipelines and valves, welding work, and wind leakage remediation of the low-temperature section | See details in procurement file |
IV. Project Overview
See in the procurement file.
V. Supplier Qualification Review Method
Please refer to the procurement documents for detailed qualification requirements.
VI. Special Notes
None.
VII. Media for Announcement and Access to Documents
- Announcement Period: 10:00 August 14, 2026 to 24:00, August 18, 2026.
- How to get documents: Download directly from the corresponding project at https://tjkpower.com/.
VIII. Submission of Response Documents
- Response Deadline: 24:00, August 18, 2026.
- Submission Method: Upload via the Purchase Module on https://tjkpower.com/.
- Note: Response documents not sent within the time limit will not be accepted.
IX. Opening of Response Files
- Mode: Electronic opening.
- Time: Within 3 business days after the response deadline.
- Location: PT. TJK POWER site.
Contact Information
Contact Person: Ouyang Hua
HP: (+62) 811 – 775 1117
E-mail: ouyh@chec.com.cn