Coal feeder calibration Procurement Announcement
PT. TJK POWER, as the project legal entity responsible for the operation of Batam TJK Power Plant in Indonesia, announces that the project is now ready for procurement. We are currently implementing the procurement of Coal feeder calibration. PT. SINERGI GLOBAL INSTRUMEN as the only supplier is invited to submit bids.
I. Purchaser (Project Legal Entity)
PT. TJK POWER
II. Funding Source
Self-funding by the Purchaser.
III. Procurement Content
| NO | Content | Scope |
|---|---|---|
| TJK-2026-04-01 | Coal feeder calibration | Annual calibration for 6 coal feeders at 2x65MW coal-fired power plant |
IV. Project Overview
The Batam TJK Power Plant is located in Batam City, Riau Islands Province, Annual calibration for 6 coal feeders at 2x65MW coal-fired power plant.
V. Supplier Qualification Review Method
Please refer to the procurement documents for detailed qualification requirements.
VI. Special Notes
None.
VII. Media for Announcement and Access to Documents
- Announcement Period: April 14, 2026 to 24:00, April 20, 2026.
- How to get documents: Download directly from the corresponding project at https://tjkpower.com/.
VIII. Submission of Response Documents
- Response Deadline: 24:00, April 20, 2026.
- Submission Method: Upload via the Purchase Module on https://tjkpower.com/.
- Note: Response documents not sent within the time limit will not be accepted.
IX. Opening of Response Files
- Mode: Electronic opening.
- Time: Within 3 business days after the response deadline.
- Location: PT. TJK POWER site.
Contact Information
Contact Person: Ouyang Hua
HP: (+62) 811 – 775 1117
E-mail: ouyh@chec.com.cn